start up
start-up and commissioning plays a major role in the transitioning plants from construction to operation. To ensure that equipment or system is construction-complete, that it can be operated safely, and that the initial running of the equipment or system has been performed, Mikhak can help its clients by:
- Designing Audit and ensuring Start-up concerns are addressed
- Preparing Startup / Commissioning / FAT / SAT documentation
- Assembling Documentation Package
- Conducting Factory Acceptance Testing (FAT)
- Conducting Site Acceptance Testing (SAT)
- Detailed Punch listing to Ensure Construction Completion
- Initial Testing of Process Equipment and Critical Utilities Prior to Validation
- Commissioning of Non-Critical Utility Systems