Startup and Commissioning
Technical checks, acceptance testing and documented handover to support the transition from construction to operation.

From construction to operation
Startup and commissioning play a major role in bringing facilities into operation. Mikhak helps clients confirm construction completion, assess equipment readiness and test initial operation.
Service scope
- Reviewing designs and addressing startup requirements
- Preparing Startup / Commissioning / FAT / SAT documentation
- Assembling the documentation package

Acceptance testing & readiness
- 01
Factory acceptance testing (FAT)
Conducting Factory Acceptance Testing (FAT)
- 02
Site acceptance testing (SAT)
Conducting Site Acceptance Testing (SAT)
- 03
Construction completion
Preparing detailed punch lists to confirm construction completion
Equipment & utilities
- Initial testing of process equipment and critical utilities before validation
- Commissioning of non-critical utility systems
Documentation package
Design reviews, startup and commissioning records, FAT / SAT documentation and punch lists are assembled into a coordinated package for the project.
- Design review and startup requirements
- Startup, commissioning, FAT and SAT documentation
- Construction-completion punch lists
- Equipment and utility testing records